- Big C Dong Nai: Big C commercial center expansion project, built right at Vung Tau Dong Nai intersection
- Big C Truong Chinh: The project was built right at the tip of Cong Hoa and Truong Chinh streets. The project was completed in 2012
- Big C An Phu: The project was built at An Phu roundabout, District 2. The project was completed in 2014
- Big C Da Lat: The project was built in the center of Da Lat city. Construction project in 2013
- Big C Quy Nhon: The project is built under the commercial center of Qui Nhon city. The project was completed in 2013
SCOPE OF WORK
Supply and Install Electrical System
MSB: Main Switch Board system up to 4000A with ATS system
SDB: Sub Distribution board with lighting control
Main power supply: bus duct and cable routing up to main capacity 4000A
Lighting system and Socket outlet
Lightning and earthing system